功能测试

killtest题库网提供最新的000-100题库下载!

发布-admin | 查看- | 发表时间-2010-7-27

考试代号:000-100
认证名称:EnterprISE TECHNICAL SUPPORT FOR Aix AND LINUX
版本号:V9.02
考题数量:53道
更新日期:2010-7-13
1. A customer has 2 VIO servers, supporting 4 client partitions. They want to configure Shared Ethernet Adapter Failover.
What is the minimum number of physical Ethernet adapters required for each VIO server?
A.1
B.2
C.4
D.8
ANSWER: A

2. What is the minimum requirement to update the managed system's firmware from the HMC if inventory scout is already installed?
A.A public internet connection
B.All logical partitions must be active
C.One partition must be configured with Service Authority
D.A local repository must be configured prior to the update
ANSWER: C

3. A customer wants to use Live Application Mobility which comes as part of the Workload Partition virtualization offering. Which of the following is the minimum configuration that will satisfy the customer requirement?
A.AIX 6.1 with POWER6
B.AIX 6.1 with POWER4
C.AIX 5.3 with POWER5
D.AIX 5.3 with POWER4
ANSWER: B

4. A customer wishes to use Live Partition Mobility for system maintenance. What is the minimum requirement?
A.PowerHA
B.Virtual I/O server 1.4
C.AIX Enterprise Edition
D.PowerVM Standard Edition
ANSWER: C

5. A customer is planning to use Live Partition Mobility on a new Power 570. Which of the following must be considered when pre-configuring the system in the IBM System Planning Tool (SPT)?
A.VIO-server setup is unsupported in SPT
B.Live Partition Mobility is unsupported in SPT
C.IVE setup is unsupported when using Live Partition Mobility
D.VIO-server setup is unsupported when using Live Partition Mobility
ANSWER: C

6. The Integrated Virtualization Manager is packaged with which of the following?
A.PowerVM
B.Virtual I/O Server
C.Partition Load Manager
D.Virtual Workload Manager
ANSWER: B

7. What is required to collect data for analysis by the Workload Estimator (WLE)?
A.WLE LPP
B.WLE servlet
C.bos.wle.rte fileset
D.AIX 5.3 TL3 or later
ANSWER: D

8. A customer has multiple POWER5 systems connected to one HMC at version 6. They have ordered a new POWER6 system. What is necessary in order to get the new POWER6 system managed by an HMC?
A.The old HMC can be used without change.
B.The old HMC must be upgraded to the latest level.
C.POWER6 and POWER5 must be connected to different HMCs.
D.The POWER6 system must have a separate partition on the HMC.
ANSWER: B
killtest题库网将在第一时间内更新题库,确保考生手中的题是最新最全的!
 

◎欢迎参与讨论,请在这里发表您的看法、交流您的观点。

最新文章
最近评论
Copyright 2010 killtest.com.cn Some Rights Reserved. 浙ICP备10016241号 | DESIGN BY Seanloo.cn